Daytona Rush: Extreme Car Raci icon

Daytona Rush: Extreme Car Raci

Version: 1.9.6
76.1MB 10,000,000+ 4.3 4.3 Reviews
Price: $0

Description Daytona Rush: Extreme Car Raci

The official DAYTONA® game is mobile now!
Do you like extreme car racing games? What about stock car? Want to be a professional formula driver? Ever wanted to ride on a Daytona sports car rush simulator? Drive, race drift, burn the speedway asphalt and feel the rush of a racing sports for free. Driving fast in traffic is the latest Daytona racing game where you experience the real feel of chasing and drifting. If you like ultimate speed race and free extreme auto racing games, challenges, and the smell of the asphalt, Daytona Rush is perfect for you!
Drivers start your engines! Do you want to be the fastest professional car driver in this extreme auto racing champion simulator game? You can experience the thrill and challenge of high-speed rally in this fun extreme racing simulator world as you drift across the racetrack! Drive your automatic real formula cars around the 3D challenging environment, spin around corners, drifting, dragging, crushing, and experiencing as much action as you can. Push your driving skills to the extreme limit as you race against time, compete against the rival racer in traffic, and race in special challenge events in the best of the free racing games. This is all about extreme car driving!
Pick your formula auto and join the extreme run, crash, and racing challenges. Start your engine for this extremely adventurous car and crashing game on the fast track road. Drive fast, race, drift, and crazily crash your way through other rivals on the amazing road of the Daytona race in this world adventure car simulator. A gem among racing games!
If you like your driving fast and furious, you’ll love Daytona Rush. Feel the ultimate rush, hit the gas on asphalt circuits, slide your wheels around twisty circuits, and master the drifting speed to arrive at the finish line. Experience and enjoy one of the best sports car racing games at top speed and challenge yourself on the super speedy Daytona road racing in this addictive adventure game of rally cars.
Start collecting the coolest new sports cars for your extreme car driving. Customize, race, and upgrade them as well as sell your tuned-up cars! You can collect the coins from racing on the speed road as long as you can arrive. Challenge yourself to increase your money in this extreme car simulator rally game.
SIMPLE CONTROLS
• Switch lanes with a single tap or swipe and move the car left and right by swiping left and right.
• Feel the rush when you overtake your opponents and avoid collisions while racing in your extreme automobile.
• Save fuel by drafting to reach the pit stop and refuel.
LEVEL UP FOR THE CUP
• Level up in 5 rally series by completing missions and unlock faster high level race cars and drive further! It's real racing at it's best!
• Earn reputation points in Nightly Races and become the best formula driver in this extreme car simulator game. A true traffic racer gem.
TUNE YOUR EXTREME CAR
• Upgrade your extreme car engine to reduce fuel consumption and strengthen the chassis to survive more collisions.
• Enhance the running gear for a quick lane change.
• Change the auto color and paint job to the way you want them. Extensive selection in stock!
Enjoy this gem among the free racing games and enjoy driving your extreme car in cool rally style! Be the best traffic racer! Burn the speedway asphalt! Race and win!
FOLLOW US
https://www.facebook.com/invictusgames
https://twitter.com/invictusgames
DAYTONA® is a registered trademark of the International Speedway, Inc. and licensed to International Speedway Corporation.

Show More Less

What's New Daytona Rush: Extreme Car Raci

Plugins update.

Information

PackageName icon
ID:
com.invictus.daytonarush
category icon
Category:
update icon
Updated:
2021-03-04
version icon
Version:
1.9.6
requirements icon
Requires:
Android 5.0 or later
filesize icon
File size:
76.1MB

Reviews

avatar
avatar
avatar
avatar
avatar
avatar
DOWNLOAD IS NOT SUPPORTED IN WEB STORE!
Use the latest version of 9Apps to download APK&OBB file of games in one click!
DOWNLOAD 9APPS