App features in brief:
-Unique daily Bible verses for users.
-User sees the previous day's Bible verse.
-2 quiz formats to test memorization (puzzle format and fill-in format).
-6 notifications or reminders spread within the day.
-Weekly memory verses pool.
-Central memory verses pool where user has access to all verses in the app.
-Search button under Central Memory Verses.
-Ability to redesign verses and share verses with loved ones.
-Suitable for phones and tablets.
Detailed App description:
This verses game is based entirely on the New Testament portion of the Holy Bible. It has a total of about 600 verses to test our memorization power!
This app gives users one New Testament memory verse every day and these verses are randomly selected for each app user.
The features are:
Home
Weekly Verses Pool
Central Verses Pool
Score
Settings
Share App
At ‘Home’, the following links are available.
1.’Today’s Verse’ displays the memory verse of the day.
2.‘Yesterday’s Verse’ shows the memory verse of the previous day for reference purposes. Any memory verse which appeared earlier than the previous day is automatically deleted but stored under Verses Pool.
3. ‘Share’ button allows the app user to share the memory verses with other.
4. Quiz format selection: A total of 2 quizzes are available each day. Tapping the 'play' icon leads to the 2 quiz formats: puzzle quiz format or missing words format.
In answering the puzzle quiz format, one is required to drag the words to form the right sentence(s). In answering the missing words format quiz, all the missing words must be entered correctly before submitting for scoring.
Under ‘settings’ the following exist:
1.‘Appearances per day’ selection: One has the option to set how often the memory verse should AUTOMATICALLY prompt us daily. A maximum of 6 times prompts per day exits.
2. ‘Font type’; ‘Font colour’ and ‘Font size’ selection: Several font types, font colours and font sizes are available to choose from.
The default background picture can also be replaced by one’s own choice.
Stay blessed as you enrich your spirit with the Word of God.
Some errors in App have been fixed.