Real Auto tik tik Rikshaw driving icon

Real Auto tik tik Rikshaw driving

Version: 1.0
46.2MB 10,000+ 4.3 4.35 Reviews
Price: $0

Description Real Auto tik tik Rikshaw driving

Auto tik tik rikshaw driving
Hey! If you are in search of rickshaw games then you are in a right place,
you will get the real experience of real auto tik tik
rickshaw driving.
Auto rickshaw drive
gives you the realistic drive to enjoy on the mountains and hilly areas and city drive as well. Now you are the driver of auto tik tik rickshaw. Drive the auto rickshaw off road in the city and village and mountains areas and pick passengers from rickshaw stand and drop them at their homes and other stop if passenger demands.
We bring the best rickshaw game driving in off road environments for you for mind blowing, where you can show your driving skills in a hilly track with three wheeler vehicle. There are verity of endless traffic and also has a rough off road environment. By driving this auto rickshaw you will be so clever and active because there is so difficult and dangers turns and rocks near the road side and tree which can damage your auto rickshaw.
Features of Real Auto tik tik rikshaw driving :
- Real 3D graphics with beautiful environment and Hills, Mountains etc.
- Real auto tuk tuk rickshaw.
- Multiple Camera Modes to Enhance Gameplay.
- Realistic and smooth control for rickshaw drivers.
- 3D Tik Tik auto rickshaw provides the best pick from stop and drop facility to their home for
passengers.
- Interesting game for every one with easy
controls.

Show More Less

Information

PackageName icon
ID:
com.Gamestoct.RealAutotuttukrikshawdriving2018
category icon
Category:
update icon
Updated:
2020-06-18
version icon
Version:
1.0
requirements icon
Requires:
Android 4.1 or later
google play icon
Available on:
filesize icon
File size:
46.2MB

Reviews

avatar
avatar
avatar
avatar
avatar
avatar
DOWNLOAD IS NOT SUPPORTED IN WEB STORE!
Use the latest version of 9Apps to download APK&OBB file of games in one click!
DOWNLOAD 9APPS