Jewels Star 2018 icon

Jewels Star

Version: 1.1
18.8MB 500,000+ 4.2 4.2
Price: $0

Description Jewels Star

Jewels Star
is a puzzle and casual game.
How to play:
- Swap the jewels to match 3 in a line to remove them
- Match the jewels until the board transparency,the
Jewels star
will appear.
- Make the jewels star down to last line to pass the level.
Features:
- We have two Game Modes: Arcade & Classic.
- Arcade Mode: more than 290 challenging levels
- Time Mode: There is no time to waste which can help you lose fat
You guys will be pleasure with
Jewels Star
2018!

Show More Less

What's New Jewels Star

- Optimize gaming
- Reduce game package size

Information

PackageName icon
ID:
com.haibaysolf.jewelsstart
category icon
Category:
update icon
Updated:
2020-07-01
version icon
Version:
1.1
requirements icon
Requires:
Android 4.1 or later
google play icon
Available on:
filesize icon
File size:
18.8MB
DOWNLOAD IS NOT SUPPORTED IN WEB STORE!
Use the latest version of 9Apps to download APK&OBB file of games in one click!
DOWNLOAD 9APPS