SOLO VPN icon

SOLO VPN

Version: 2.3
20.5MB 5,000+ 3.0 3
Price: $0
⚠️ You need 9Apps App to install .XAPK File. How to install XAPK?

Description SOLO VPN

SOLO VPN app is free which provides unlimited VPN proxy. It is easy and one tap to connect.
Powerful features of SOLO VPN:
- Free, No speed limitation, No bandwidth limitation
-One tap connection, easy to use
- Largest VPN coverage
- Unblock the blocked sites
- Data encryption, Privacy Protection
- Firewall Bypass, Hide public IP
- Protection from hackers & snoopers on public Wi-Fi connection.

Show More Less

Information

PackageName icon
ID:
com.riponku.solovpn
category icon
Category:
update icon
Updated:
2021-04-23
version icon
Version:
2.3
requirements icon
Requires:
Android 4.4 or later
filesize icon
File size:
20.5MB
DOWNLOAD IS NOT SUPPORTED IN WEB STORE!
Use the latest version of 9Apps to download APK&OBB file of games in one click!
DOWNLOAD 9APPS