ikon Calculator

Calculator

Versi: 1.3.1
1.1MB 1,000,000+ 4.3 4.35 ULASAN
Price: $0

Deskripsi Calculator

This is a simple calculator which allows you to:
- Perform basic operations (addition, subtraction, multiplication and division);
- Calculate the percentage of a number;
- Use parentheses;
- Consult recent operations in order to view or compare the results of the operations that you have performed. The last ten operations are temporarily saved, they will be lost
the moment you turn off your device or when the system clears its memory;
- Two themes, you can choose a light (default) or a dark theme in the Settings menu;
- On tablets you can view the calculator as well as your recent operations at the same time.
Permissions: none.

Tampilkan Selengkapnya kurang

Yang Terbaru Calculator

Compatible with other smartphones and tablets.

Informasi

PackageName icon
ID:
com.spectensys.calculatorfree
category icon
Kategori:
update icon
Perbarui:
2017-08-23
version icon
Versi:
1.3.1
requirements icon
Butuh:
Android 2.2 or later
google play icon
Available on:
filesize icon
Ukuran File:
1.1MB

ULASAN

avatar
avatar
avatar
avatar
avatar
avatar
DOWNLOAD IS NOT SUPPORTED IN WEB STORE!
Use the latest version of 9Apps to download APK&OBB file of games in one click!
DOWNLOAD 9APPS