Music Player for Android أيقونة

Simple Music Mp3 Pro

الإصدار: 1.0
968.6KB 50,000+ 3.0 3
Price: $0

تفاصيل التطبيق Simple Music Mp3 Pro

Music Player for Android will search all music files in your phone include SD card, free to get this perfect audio player and media player.
This music player is not only based on artists or albums, but also based on the folder structure.
Key Features:
- Browse and play your music by albums, artists, genres, songs, playlists, and album artists.
- High quality decoding with mp3,mp4/m4a, wma, flac and ape;
- Smart Playlists for easy access to your favorite and Most Played songs.
- Music Library wide SEARCH. Find all your music never been so easy.
- Manually pick your preferred album artwork, artist pictures, genre illustrations from the Internet, the Gallery app, ID3 tags, or album folder.
Music Player for Android is the one of the most successful and high quality music players for Android."

عرض المزيد أقل

المعلومات

PackageName icon
ID:
com.appsgenzix.simple.music.mp.pro
update icon
تحديث:
2015-09-11
version icon
الإصدار:
1.0
requirements icon
نظام الأندرويد المتوافق:
Android 2.3 or later
filesize icon
حجم الملف:
968.6KB
DOWNLOAD IS NOT SUPPORTED IN WEB STORE!
Use the latest version of 9Apps to download APK&OBB file of games in one click!
DOWNLOAD 9APPS